East West Rail have released their 2024 consultation on the Bedford to Cambridge section
Their route is via a Cambourne North station,,,, going parallel to the A428 and crossing over near Highfields Caldecote and then as an embanked line down between Toft and Comberton (near the layby) past Little Eversden, to the south west of the Royston Lane A603 It goes over A603 with a viaduct before heading to the south of Haslingfield, tunnelled through Chapel Hill to join the Kings Cross line near Harston.
There is/will be an information point at Comberton Library and an in-person consultation event in Comberton, Comberton Village Hall, 10 January 2025, 2pm – 7pm
Responses need to be in by 25th January 2025 – go to their website for much more information
and an on-line virtual consultation website (which has little to nothing on Comberton!)
As part of their latest proposals they’re providing information on a preference for green traction power in the form of discontinuous electrification with hybrid battery-electric trains, after the Chancellor confirmed government support for the project in the Autumn budget.
More bits relevant to Comberton are here